Leave a Message

Thank you for your message. I will be in touch with you shortly.

Explore Properties
Background Image

Permits for Decks, Porches and Additions in Raleigh

November 6, 2025

Thinking about adding a deck, screened porch, or second-story addition to your Raleigh home? The right permit can save you time, money, and stress while protecting your investment. You want a clear plan so you do not run into stop-work orders or surprises when you sell. In this guide, you will learn what projects typically need a permit in Raleigh, what to submit, how reviews and inspections work, and how permits affect resale. Let’s dive in.

What needs a permit in Raleigh

Most work that changes structure, increases conditioned space, affects exits, or modifies the building envelope requires a permit. You should plan to apply for a building permit if you are:

  • Building a second-story addition or any addition that enlarges conditioned floor area.
  • Enclosing an existing porch or deck to create habitable or conditioned space.
  • Constructing a new attached porch, adding a roofed or screened porch, or building a deck that attaches to the house.
  • Changing roof framing to support a porch roof or addition.
  • Adding or relocating plumbing, HVAC, or electrical systems. Trade permits are typically required.

Some small or detached work may be exempt under residential code provisions. Common examples include:

  • One-story detached accessory structures used for storage or playhouses with a floor area not more than 200 square feet.
  • Platforms, sidewalks, and decks that are not more than 30 inches above adjacent grade and not attached to the dwelling.
  • Ordinary repairs that do not affect structure or life safety, such as like-for-like deck board replacement or painting. If repairs touch structure or code elements, a permit is usually required.

Always confirm exemptions with Raleigh’s permitting staff. Even if your project is exempt from a building permit, other rules can still apply.

Zoning rules still apply

Raleigh’s zoning rules govern setbacks, height, and lot coverage. Your deck or porch placement and size must meet these requirements whether or not a building permit is required. If your property is in a floodplain, watershed overlay, or historic district, expect added reviews or documentation. Wake County property and GIS records can help you verify parcel lines, easements, and past permits before you design.

What to prepare before you apply

A complete submittal speeds up review. Gather these items before you upload plans to the city’s permit portal:

  • Permit application details: property address, parcel ID, owner and contact info, estimated project valuation, and contractor information including NC license number if applicable.
  • Site plan: show property lines, the house footprint, existing and proposed structures, distances to property lines, and impervious area calculations if required. Include driveways, easements, and any floodplain or drainage features.
  • Construction drawings:
    • Decks and porches: plan view with dimensions, framing layout, joist spans, posts and beams, footing size and depth, ledger attachment and flashing details, connectors and hardware, guard and handrail details.
    • Additions and second stories: floor plans, elevations, foundation and footing plans, roof and structural framing diagrams, and engineered calculations when required.
  • Energy code compliance: if you create or alter conditioned space, provide required energy documentation. Include insulation values, window and door U-values, and HVAC sizing and efficiency.
  • Mechanical, plumbing, and electrical: separate trade plans and permits if you add or change systems. Include equipment specs, load calculations, and fixture or wiring layouts as needed.
  • Product documentation: submit manufacturer installation instructions for specialty products like composite decking, structural connectors, and ledger hardware.
  • Records check: review prior permits and inspections for your address to confirm existing conditions and identify any open issues.

Clear, legible drawings and complete details reduce review comments and re-submittals.

How Raleigh’s review and inspections work

Submittal

You apply online through Raleigh’s permit portal, upload plans, and pay the initial plan review fee. Electronic plan review is standard, so ensure files are properly named and oriented.

Plan review

City reviewers check building code, zoning, stormwater and impervious coverage, and other applicable items. If your property falls under a watershed overlay, floodplain, or historic review, those departments weigh in. You will receive comments through the portal. Address corrections on the plans and resubmit until all disciplines approve.

Permit issuance

After all reviews approve and fees are paid, the city issues your permit electronically. Post the permit card or number on site as required before work begins.

Inspections

Inspections are staged and must be passed before you cover work. Typical inspections include:

  • Footing or foundation inspection before placing concrete.
  • Structural framing and ledger or connection inspection at rough framing.
  • Rough electrical, plumbing, and HVAC if applicable.
  • Insulation and energy inspection for conditioned space.
  • Final inspections for building and each trade.

Schedule inspections through the portal or by phone. Inspectors document approvals or corrections the day of inspection. Do not proceed to the next stage until the current stage has passed.

Enforcement

If work starts without permits or required inspections, the city can issue a stop-work order, citations, or fines. You may have to obtain retroactive permits and perform corrections, which can add time and cost.

Timelines, fees, and scheduling

Plan review times vary by scope and submittal quality:

  • Small decks and non-conditioned porches are often reviewed in days to a few weeks, when plans are complete.
  • Larger additions or second-story projects that need engineering or multiple departmental reviews can take 2 to 6 weeks or more.

Inspection scheduling often offers next-business-day or multi-day windows. Build time into your schedule for re-inspections if corrections are needed. Fees are based on valuation and fee schedules. Expect a plan review fee at submittal and permit fees at issuance, plus separate fees for trade permits.

Contractor licensing and quality control

For projects above the state threshold, North Carolina requires a licensed general contractor. Even for smaller jobs, verify your contractor’s NC license status and insurance and confirm local registration if the city requires it. Ask for site-specific ledger and flashing details for attached decks, since inspectors focus closely on those connections. For complex structural work like second stories, consult a licensed engineer.

Resale impacts and how to protect value

Unpermitted work can slow or derail a sale. Buyers, lenders, and insurers often ask for proof of permits and final inspections. If records do not align with what is built, you could face delays, required retrofits, or concessions.

To protect your resale value:

  • Pull permits for structural changes and any work that creates conditioned space.
  • Keep copies of permits, approved plans, and final inspection approvals in a property file.
  • If you suspect past unpermitted work, request a records search and speak with a contractor or building official about retroactive permits and likely corrections.

Homeowner checklist before you start

  • Confirm whether your project adds conditioned space or changes structure.
  • Verify zoning setbacks, lot coverage, and any overlays using local property and GIS tools.
  • Check your address in the permit portal for prior permits and open issues.
  • Hire appropriately licensed and insured contractors and consult an engineer for major structural work.
  • Prepare a clear site plan, complete construction drawings, and product documentation.
  • Include energy code forms if you are enclosing a porch or adding conditioned area.
  • Plan your schedule around staged inspections and potential re-inspections.
  • Keep all records for future resale.

If work is already completed

You can often apply for a retroactive permit, but the city may require you to expose concealed work and make corrections to meet current codes. Fees and timelines can be higher than if you had permitted up front. Gather any invoices, photos, and product documentation to help the reviewer understand what was built. Then coordinate inspections and corrections to close out the permit with a final approval.

When a permit may not be required

Remember, some projects are exempt from a building permit under residential code provisions. Detached one-story storage sheds up to 200 square feet are commonly exempt. Low platforms or decks 30 inches or less above grade that are not attached to the house can be exempt as well. Ordinary non-structural repairs like replacing deck boards are usually fine without a permit. Always confirm local application with Raleigh before you start, and still follow zoning rules.

Ready to plan your project or prepare your home for market? For practical guidance on timing, contractor selection, and resale planning, connect with Tonya for a quick consult. Let’s make your next step smooth and confidence-building.

If you want a second set of eyes before you list or buy, reach out to Tonya Wicker Hunt for tailored, local advice. Let’s Connect.

FAQs

Do you need a permit for a new deck in Raleigh?

  • If the deck attaches to your home or rises more than 30 inches above grade, a permit is typically required. Detached, low platforms may be exempt.

Is a screened porch considered an addition in Raleigh?

  • A roofed, attached screened porch usually requires a building permit, and if you enclose it to create conditioned space, energy compliance and trade permits also apply.

How long do Raleigh permits take for decks and porches?

  • Simple decks and non-conditioned porches are often reviewed in days to a few weeks; larger or engineered additions commonly take 2 to 6 weeks depending on workload and completeness.

What inspections should you expect for a porch or addition?

  • Typical inspections include footing or foundation, rough framing and connections, rough trade inspections if needed, insulation for conditioned areas, and final inspections.

Can you get a permit after work is finished in Raleigh?

  • Many jurisdictions allow retroactive permits, but you may need to open up concealed work and make corrections; fees and timelines can be higher than permitting up front.

How can you check if past work was permitted?

  • Search the city’s permit portal and Wake County property records for prior permits and inspections tied to your address or parcel.

Follow Tonya On Instagram